← all stations

Weerawila Double Tree By Hilton 60kW 60 kW greenev

id greenev:001582101501 · Aug 15 08:16 → Aug 15 09:34 (+05:30) · generated 2026-08-15 09:35:06 +05:30
1
Sessions
0
Active now
12m
Avg session
12m
Total busy
8.0%
Utilization

Profitability profitable

Delivered ≈ 98.5% of 60 kW × time occupied. Break-even = 3 kWh/kW/day. Tariff 142 LKR/kWh.

226.8
kWh delivered/day
180
Break-even kWh/day
126%
of break-even
LKR 6,650
Margin/day
12.3
kWh total (span)

Connectors

ConnectorTypeNowSessionsAvg
#1 DC available 1 12m
#2 DC available 0

Connector timeline

Aug 15 08:16Aug 15 09:34 (+05:30)09:12 → 09:25 (12m)Connector 1

Occupied by hour of day

00100: 00001: 002: 00203: 004: 00405: 006: 00607: 008: 00809: 110: 01011: 012: 01213: 014: 01415: 016: 01617: 018: 01819: 020: 02021: 022: 02223: 0

All sessions (1)

ConnStartEndDuration
1 Aug 15 09:12 Aug 15 09:25 12m